Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EL RIO CANAL ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'L-14 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'SW FORK LOXAHATCHEE RVR ' (1) ·
'WPB CANAL C-51 ' (1)
'16th St/College Ln' (1) ·
'2nd AVENUE NORTH ' (1) ·
'66th Avenue ' (1) ·
'CAMINO REAL ' (1) ·
'CENTRAL BLVD ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'KIRK ROAD ' (1) ·
'LYONS ROAD ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
884084 (1) ·
884099 (1) ·
930392 (1) ·
934151 (1) ·
934272 (1) ·
934313 (1) ·
934315 (1) ·
934345 (1) ·
934346 (1) ·
934364 (1) ·
934468 (1) ·
934469 (1) ·
934751 (1) ·
934925 (1) ·
934926 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
934956 (1) ·
934960 (1)
'0.3MI N of SR-706 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'Inter 66th Ave/College Ln' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.