Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'CANAL E-105 ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'E-4 CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'GARDEN CANAL ' (1) ·
'I-95 ' (1) ·
'L.W.D.D L-14 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'RELIEF CANAL ' (1)
'6TH AVE SO. EB ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CENTER DR. ' (1) ·
'CYPRESS WAY ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'MINER RD. ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'Ranch Rd. ' (1) ·
'SR 614 (INDRIO-RD)' (1) ·
'SW 18TH STREET WB ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
700130 (1) ·
934135 (1) ·
934222 (1) ·
934278 (1) ·
934307 (1) ·
934350 (1) ·
934428 (1) ·
934441 (1) ·
934468 (1) ·
934469 (1) ·
934901 (1) ·
934942 (1) ·
934948 (1) ·
935204 (1) ·
936262 (1) ·
937001 (1) ·
937703 (1) ·
940137 (1) ·
945265 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI E OF CONGRESS AVE ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.8MI N OF SW BECKER RD ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'Ranch Rd. - I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.