Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'E3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'GARDEN CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LATERAL CANAL ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-68 ' (1)
'21ST ST SW ' (1) ·
'Becker Rd. ' (1) ·
'CAMINO REAL ' (1) ·
'CYPRESS WAY ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NW 13 ST ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SR 614 (INDRIO-RD)' (1)
884047 (1) ·
894019 (1) ·
934272 (1) ·
934420 (1) ·
934421 (1) ·
934960 (1) ·
934964 (1) ·
935204 (1) ·
935215 (1) ·
936262 (1) ·
937001 (1) ·
940097 (1) ·
940137 (1) ·
941001 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'Just North of SR70 on I95' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)