Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-4 CANAL ' (1) ·
'E3 CANAL ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'GARDEN CANAL ' (1) ·
'L-30 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1)
'Becker Rd. ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CYPRESS WAY ' (1) ·
'LAKE IDA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'NW 13 ST ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'PROS. FARMS ROAD ' (1)
934139 (1) ·
934420 (1) ·
934421 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
934936 (1) ·
934937 (1) ·
934942 (1) ·
934964 (1) ·
935204 (1) ·
935215 (1) ·
936262 (1) ·
937001 (1) ·
941001 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)