Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-4 CANAL ' (1) ·
'E3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'GARDEN CANAL ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LATERAL CANAL ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'M CANAL ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'21ST ST SW ' (1) ·
'Becker Rd. ' (1) ·
'CAMINO REAL ' (1) ·
'CYPRESS WAY ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'MINER RD. ' (1) ·
'NW 13 ST ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1)
884047 (1) ·
894019 (1) ·
934139 (1) ·
934151 (1) ·
934272 (1) ·
934315 (1) ·
934420 (1) ·
934421 (1) ·
934925 (1) ·
934926 (1) ·
934942 (1) ·
934960 (1) ·
934964 (1) ·
935204 (1) ·
935215 (1) ·
936262 (1) ·
937001 (1) ·
941001 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.