Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'BOYNTON CANAL ' (1) ·
'Cabana Colony Circle ' (1) ·
'Cambridge Canal ' (1) ·
'Canal ' (1) ·
'Canal C-51 ' (1) ·
'E-2 Canal ' (1) ·
'E-4 Canal ' (1) ·
'FL TPK SR-91 ' (1) ·
'I-95 ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'Lateral C Canal ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'Rio Mar Bay ' (1) ·
'Sweetwater Branch ' (1) ·
'Turkey Creek ' (1)
'Banana River Drive' (1) ·
'Bay Drive ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Hatton Road ' (1) ·
'Hypoluxo Rd ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LittleRanchesTrail' (1) ·
'Old Boynton Road ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Port Malabar BL WB' (1) ·
'Prosperity Farms R' (1) ·
'River Drive ' (1) ·
'Taylor Rd ' (1) ·
'Trailwood Drive ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1)
704019 (1) ·
704063 (1) ·
704097 (1) ·
704098 (1) ·
705920 (1) ·
794010 (1) ·
796414 (1) ·
884056 (1) ·
884076 (1) ·
885811 (1) ·
885812 (1) ·
934178 (1) ·
934291 (1) ·
934294 (1) ·
934367 (1) ·
934552 (1) ·
934913 (1) ·
934951 (1) ·
934981 (1) ·
935920 (1)
'0.1 Mile West of A1A ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'250ft North of SR-60 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'South Side of US-98 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)