Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal / Trib 1 ' (1) ·
'Blue Lake Equalizer ' (1) ·
'BOYNTON CANAL ' (1) ·
'Cabana Colony Circle ' (1) ·
'Cambridge Canal ' (1) ·
'Canal ' (1) ·
'E-2 Canal ' (1) ·
'E-4 Canal ' (1) ·
'FL TPK SR-91 ' (1) ·
'I-95 ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral C Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'Rio Mar Bay ' (1) ·
'SFWMD L-13 CANAL ' (1) ·
'Trib to Spruce Creek ' (1) ·
'Turkey Creek ' (1)
'5th Street ' (1) ·
'Bay Drive ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR-700 ' (1) ·
'E. Minnesota Ave. ' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Esplanade Avenue ' (1) ·
'Hatton Road ' (1) ·
'Hypoluxo Rd ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'Old Boynton Road ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Port Malabar BL WB' (1) ·
'Prosperity Farms R' (1) ·
'River Drive ' (1) ·
'Tomoka Farms Rd ' (1) ·
'Trailwood Drive ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1)
704019 (1) ·
704097 (1) ·
704098 (1) ·
705920 (1) ·
794014 (1) ·
794045 (1) ·
796413 (1) ·
796414 (1) ·
880019 (1) ·
884069 (1) ·
884076 (1) ·
885811 (1) ·
885812 (1) ·
930085 (1) ·
934178 (1) ·
934367 (1) ·
934552 (1) ·
934913 (1) ·
934951 (1) ·
934981 (1)
'0.1 Mile West of A1A ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'1MI NORTH OF SR-60 ' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'At 58th Ave ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'INT. OF CR-700 & CR-880 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.