Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'5th Street ' (1) ·
'Bay Drive ' (1) ·
'Esplanade Avenue ' (1) ·
'Hatton Road ' (1) ·
'Hypoluxo Rd ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'Old Boynton Road ' (1) ·
'Port Malabar BL WB' (1) ·
'Prosperity Farms R' (1) ·
'River Drive ' (1) ·
'Trailwood Drive ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1)
704097 (1) ·
704098 (1) ·
705920 (1) ·
796413 (1) ·
796414 (1) ·
884069 (1) ·
885811 (1) ·
885812 (1) ·
934178 (1) ·
934367 (1) ·
934552 (1) ·
934913 (1) ·
934951 (1) ·
934981 (1)
'0.1 Mile West of A1A ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'At 58th Ave ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)