Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Scour 113 : Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. or Bridge not over waterway. & Future Year 115: 2035

Use the filters below to narrow your results.

Status:
Date:
County 003:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
1 (1) · 2 (1) · 5 (1) · 6 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Channel 061:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115: (Click arrow to add another value)
Clearance 116:

Showing below up to 5 results in range #1 to #5.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)