Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th Street Canal ' (1) ·
'C-59 Canal ' (1) ·
'Canal ' (1) ·
'Creek ' (1) ·
'Daytona Canal ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Gabordy's Canal ' (1) ·
'Halifax Canal ' (1) ·
'I-95 ' (1) ·
'Lateral Canal A ' (1) ·
'Misner Branch ' (1) ·
'Nova Road Canal ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Reed Canal ' (1) ·
'SR-46 ' (1) ·
SR-401 (1) ·
Zoo Trail (1)
'10th Street ' (1) ·
'Alta Drive ' (1) ·
'Ballough Street ' (1) ·
'Bellevue Ave ' (1) ·
'Daytona Avenue ' (1) ·
'Driveway Ent. Exit' (1) ·
'I-95 ' (1) ·
'Indian Lake Road ' (1) ·
'Lantern Park Drive' (1) ·
'Main Trail ' (1) ·
'Pace Drive ' (1) ·
'Pineda Causeway ' (1) ·
'Riverside Drive ' (1) ·
'Shop Ctr Entrance ' (1) ·
'Sixth St. ' (1) ·
'SR-60 ' (1) ·
'St. Johns Heritage' (1) ·
'US27 SR-25 & 80 ' (1) ·
Overpass Ramp (1) ·
Pineda Causeway (1)
700218 (1) ·
700225 (1) ·
700226 (1) ·
700230 (1) ·
704190 (1) ·
705925 (1) ·
790164 (1) ·
790165 (1) ·
790179 (1) ·
790199 (1) ·
790249 (1) ·
790801 (1) ·
795000 (1) ·
795503 (1) ·
795504 (1) ·
795587 (1) ·
795713 (1) ·
796000 (1) ·
796549 (1) ·
880106 (1) ·
930054 (1)
.1 Mi E of I-95 (1) ·
'.3 mi South of Mason Ave ' (1) ·
'0.02 MI S/O LPGA Blvd ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'10thSt 1 Block E of Nova ' (1) ·
'1200ft. N. of SR-400 ' (1) ·
'1400ft. N. of SR-400 ' (1) ·
'2 Mi West of Jupiter Blvd' (1) ·
'2.35MI E OF HENDRY CO LIN' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'2.9 Miles South of US-192' (1) ·
'200ft. S of 10th Street ' (1) ·
'40ft. E. of SR-5A ' (1) ·
'800ft. N. of SR-400 ' (1) ·
'At LPGA Blvd. ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'I-95 over SR-46 ' (1) ·
'Sixth St. & Nova Rd Canal' (1) ·
'SR-60 East of 66 Ave ' (1) ·
0.7 Mile N of SR-528 (1)
26433815 (1) ·
27382059 (1) ·
28010030 (1) ·
28024500 (1) ·
28113278 (1) ·
28113400 (1) ·
28250000 (1) ·
28395825 (1) ·
29001931 (1) ·
29093020 (1) ·
29095886 (1) ·
29103958 (1) ·
29104333 (1) ·
29104539 (1) ·
29112242 (1) ·
29133119 (1) ·
29134537 (1) ·
29140999 (1) ·
29143549 (1) ·
29144552 (1) ·
29165358 (1)
80274947 (1) ·
80375599 (1) ·
80422199 (1) ·
80422723 (1) ·
80434410 (1) ·
80448000 (1) ·
80510902 (1) ·
80521049 (1) ·
80544173 (1) ·
81002450 (1) ·
81012374 (1) ·
81014276 (1) ·
81014315 (1) ·
81014361 (1) ·
81015422 (1) ·
81022149 (1) ·
81025160 (1) ·
81030833 (1) ·
81031853 (1) ·
81054109 (1) ·
81091698 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No deficiencies (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)