Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service On 042a:
Highway - Pedestrian
& Inspect Date 090:
01-18
& Future Year 115:
2034
Use the filters below to narrow your results.
12250 (1) ·
12252 (1) ·
12274 (1) ·
12278 (1) ·
12285 (1) ·
13761 (1) ·
13762 (1) ·
13765 (1) ·
13770 (1) ·
13778 (1) ·
13779 (1) ·
13789 (1) ·
13806 (1) ·
13807 (1) ·
13814 (1) ·
13816 (1) ·
13817 (1) ·
15897 (1) ·
15898 (1) ·
16028 (1) ·
17894 (1) ·
17895 (1) ·
17897 (1) ·
17916 (1) ·
18750 (1) ·
18775 (1) ·
19189 (1) ·
19557 (1)
'B-19 Canal ' (1) ·
'C-1 Canal ' (1) ·
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'FEC Railroad ' (1) ·
'FPL Cooling Disch. Canal' (1) ·
'FPL Cooling Intake Canal' (1) ·
'Goat Creek ' (1) ·
'Halifax Canal ' (1) ·
'Halifax River ' (1) ·
'I-4 ' (1) ·
'Indian River Relief ' (1) ·
'Lateral "B" Canal ' (1) ·
'Little Tomoka River ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Moore's Creek ' (1) ·
'Nova Canal ' (1) ·
'Reed Canal ' (1) ·
'Sykes Creek ' (1) ·
'Tillman Canal ' (1) ·
'Tomoka River ' (1) ·
'Turnbull Creek ' (1)
'4th Street ' (1) ·
'Americana Blvd. ' (1) ·
'Barwick Rd. ' (1) ·
'Barwick Road ' (1) ·
'Center Avenue ' (1) ·
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CR-707(Citrus Ave)' (1) ·
'Fountainhead Blvd.' (1) ·
'Jupiter Blvd. ' (1) ·
'Magnolia Avenue ' (1) ·
'Malabar Rd ' (1) ·
'Minton Road CR-509' (1) ·
'N 13th Street ' (1) ·
'Old Dixie Hwy. ' (1) ·
'Orange Avenue ' (1) ·
'Orange camp Rd. ' (1) ·
'Palm Bay Parkway ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'Richland Ave ' (1) ·
'Riverside Dr ' (1) ·
'Saul Street ' (1) ·
'Service Road ' (1) ·
'Turnbull Bay Road ' (1) ·
'Tymber Creek Road ' (1) ·
'Valkaria Road ' (1) ·
'Willow Run Blvd. ' (1) ·
'Woodcliff Drive ' (1)
704004 (1) ·
704013 (1) ·
704048 (1) ·
704075 (1) ·
704095 (1) ·
705603 (1) ·
705909 (1) ·
705918 (1) ·
705924 (1) ·
790211 (1) ·
794015 (1) ·
794016 (1) ·
794022 (1) ·
794042 (1) ·
794076 (1) ·
794077 (1) ·
794120 (1) ·
794194 (1) ·
795001 (1) ·
795521 (1) ·
796401 (1) ·
796500 (1) ·
796518 (1) ·
884074 (1) ·
934920 (1) ·
934921 (1) ·
940047 (1) ·
945009 (1)
'.2mi W of Clyde Morris Bl' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.1Mi S of LPGA Blvd ' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.2 mile west of US-17 ' (1) ·
'0.2 Miles North of SR 40 ' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.3Mi N of Orange Ave. ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'10ft. East of Nova Road ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'2.5 Miles West of US-1 ' (1) ·
'At CR-613 ' (1) ·
'At Intersection w LPGA BL' (1) ·
'At Reed Canal Road ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'Orange camp Rd. over I-4 ' (1)
26211596 (1) ·
26211635 (1) ·
27263922 (1) ·
27270318 (1) ·
27363390 (1) ·
27571293 (1) ·
27595640 (1) ·
28003971 (1) ·
28004870 (1) ·
28004888 (1) ·
28004932 (1) ·
28070604 (1) ·
28220892 (1) ·
28370440 (1) ·
28504313 (1) ·
28504314 (1) ·
28590460 (1) ·
29030413 (1) ·
29073249 (1) ·
29092052 (1) ·
29092945 (1) ·
29110190 (1) ·
29123122 (1) ·
29123848 (1) ·
29143174 (1) ·
29144556 (1) ·
29152450 (1) ·
29203187 (1)
80121056 (1) ·
80192646 (1) ·
80201436 (1) ·
80264867 (1) ·
80342637 (1) ·
80401747 (1) ·
80401763 (1) ·
80401977 (1) ·
80413508 (1) ·
80414817 (1) ·
80424614 (1) ·
80441510 (1) ·
80480991 (1) ·
80573537 (1) ·
81003691 (1) ·
81005885 (1) ·
81010006 (1) ·
81010311 (1) ·
81014619 (1) ·
81014689 (1) ·
81021145 (1) ·
81030053 (1) ·
81051074 (1) ·
81074440 (1) ·
81145411 (1) ·
81193143 (1) ·
81193290 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 28 results in range #1 to #28.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)