Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12274 (1) ·
13773 (1) ·
13810 (1) ·
15173 (1) ·
15274 (1) ·
15809 (1) ·
15854 (1) ·
15855 (1) ·
15928 (1) ·
15929 (1) ·
15937 (1) ·
15943 (1) ·
15962 (1) ·
15974 (1) ·
16028 (1) ·
16058 (1) ·
16059 (1) ·
16083 (1) ·
17908 (1) ·
17910 (1) ·
17912 (1) ·
17913 (1) ·
17916 (1) ·
18750 (1) ·
18775 (1) ·
19551 (1) ·
19557 (1)
'C-1 Canal ' (1) ·
'Canal ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'E3 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'EL RIO CANAL ' (1) ·
'FEC Railroad ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'GARDEN CANAL ' (1) ·
'I-4 ' (1) ·
'Indian River ' (1) ·
'L-5 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LATERAL CANAL ' (1) ·
'Little Tomoka River ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'Moore's Creek ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-68 ' (1) ·
'SR-9 (I-95) ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Yacht Club Cut ' (1)
'21ST ST SW ' (1) ·
'Apollo Boulevard ' (1) ·
'Becker Rd. ' (1) ·
'CAMINO REAL ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'CYPRESS WAY ' (1) ·
'Fifth Street ' (1) ·
'Fountainhead Blvd.' (1) ·
'Graham Road ' (1) ·
'Harrison Street ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'N 13th Street ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NW 13 ST ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'Orange camp Rd. ' (1) ·
'Palm Bay Parkway ' (1) ·
'S. Burnett Rd ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SR 614 (INDRIO-RD)' (1) ·
'Tymber Creek Road ' (1) ·
'Wickham Road ' (1) ·
'Williams Road ' (1)
704193 (1) ·
704197 (1) ·
705100 (1) ·
705603 (1) ·
705604 (1) ·
705924 (1) ·
790211 (1) ·
794063 (1) ·
794194 (1) ·
795701 (1) ·
884047 (1) ·
894019 (1) ·
934272 (1) ·
934420 (1) ·
934421 (1) ·
934960 (1) ·
934964 (1) ·
935204 (1) ·
935215 (1) ·
936262 (1) ·
937001 (1) ·
940047 (1) ·
940097 (1) ·
940100 (1) ·
940137 (1) ·
941001 (1) ·
945009 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.1MI E of Riveredge Blvd' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.2 Miles North of SR 40 ' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi N of Orange Ave. ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At Pluckebaum Rd ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'CR-509 .5 Mi N of SR-518 ' (1) ·
'Just North of SR70 on I95' (1) ·
'Orange camp Rd. over I-4 ' (1)
26201757 (1) ·
26203857 (1) ·
26214151 (1) ·
26221050 (1) ·
26221083 (1) ·
26281579 (1) ·
26375624 (1) ·
26401280 (1) ·
26490539 (1) ·
26582879 (1) ·
27123412 (1) ·
27254533 (1) ·
27263922 (1) ·
27264995 (1) ·
27270318 (1) ·
27311800 (1) ·
27335447 (1) ·
28004870 (1) ·
28070604 (1) ·
28073710 (1) ·
28080403 (1) ·
28204418 (1) ·
28211812 (1) ·
28590460 (1) ·
29004760 (1) ·
29024857 (1) ·
29152450 (1)
80043055 (1) ·
80052354 (1) ·
80054082 (1) ·
80054091 (1) ·
80054960 (1) ·
80055282 (1) ·
80065459 (1) ·
80075060 (1) ·
80081246 (1) ·
80084210 (1) ·
80192646 (1) ·
80200100 (1) ·
80201436 (1) ·
80231656 (1) ·
80233690 (1) ·
80255073 (1) ·
80262200 (1) ·
80384610 (1) ·
80401763 (1) ·
80401823 (1) ·
80432415 (1) ·
80441510 (1) ·
80464729 (1) ·
80545465 (1) ·
80575726 (1) ·
81074440 (1) ·
81145411 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 27 results in range #1 to #27.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)