Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal / Trib 1 ' (1) ·
'BOYNTON CANAL ' (1) ·
'C-1 Canal ' (1) ·
'Cabana Colony Circle ' (1) ·
'Cambridge Canal ' (1) ·
'Canal ' (1) ·
'Drainage Canal ' (1) ·
'E-2 Canal ' (1) ·
'E-4 Canal ' (1) ·
'Eau Gallie River ' (1) ·
'FL TPK SR-91 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral C Canal ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'Reed Canal ' (1) ·
'Rio Mar Bay ' (1) ·
'Trib to Spruce Creek ' (1) ·
'Turkey Creek ' (1)
'4th Street ' (1) ·
'5th Street ' (1) ·
'Apollo Boulevard ' (1) ·
'Bay Drive ' (1) ·
'Esplanade Avenue ' (1) ·
'HATTON HIGHWAY ' (1) ·
'Hatton Road ' (1) ·
'Hypoluxo Rd ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'Lake Ashby Road ' (1) ·
'Oak Lea Drive ' (1) ·
'Old Boynton Road ' (1) ·
'Old Dixie Highway ' (1) ·
'Orange camp Rd. ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Palm Bay Parkway ' (1) ·
'Port Malabar BL WB' (1) ·
'Prosperity Farms R' (1) ·
'River Drive ' (1) ·
'Tomoka Farms Rd ' (1) ·
'Trailwood Drive ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1)
704097 (1) ·
704098 (1) ·
705604 (1) ·
705920 (1) ·
705924 (1) ·
790211 (1) ·
794045 (1) ·
794123 (1) ·
794124 (1) ·
794146 (1) ·
796413 (1) ·
796414 (1) ·
796548 (1) ·
884069 (1) ·
884074 (1) ·
884076 (1) ·
885811 (1) ·
885812 (1) ·
934178 (1) ·
934367 (1) ·
934552 (1) ·
934553 (1) ·
934913 (1) ·
934951 (1) ·
934981 (1)
'0.1 Mile West of A1A ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'200ft. East of SR-415 ' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At 58th Ave ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'At CR-613 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
26315430 (1) ·
26322077 (1) ·
26322087 (1) ·
26342040 (1) ·
26424000 (1) ·
26470110 (1) ·
26512009 (1) ·
27351435 (1) ·
27354128 (1) ·
27363390 (1) ·
27382700 (1) ·
27382938 (1) ·
28004870 (1) ·
28010155 (1) ·
28073710 (1) ·
28155940 (1) ·
28160000 (1) ·
28563087 (1) ·
28590460 (1) ·
29032507 (1) ·
29060108 (1) ·
29071179 (1) ·
29093016 (1) ·
29210415 (1) ·
29211227 (1)
80041860 (1) ·
80050300 (1) ·
80084971 (1) ·
80085039 (1) ·
80102300 (1) ·
80214090 (1) ·
80214400 (1) ·
80254958 (1) ·
80264867 (1) ·
80264917 (1) ·
80325180 (1) ·
80331600 (1) ·
80354529 (1) ·
80384610 (1) ·
80434440 (1) ·
80434460 (1) ·
80441510 (1) ·
80591575 (1) ·
81001126 (1) ·
81015661 (1) ·
81040678 (1) ·
81055781 (1) ·
81060905 (1) ·
81060951 (1) ·
81145411 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.