bridge data > Scour 113:
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.
& Future Year 115 :
2034 or
2036
Use the filters below to narrow your results.
704017 (1) ·
704063 (1) ·
704144 (1) ·
794008 (1) ·
794009 (1) ·
794010 (1) ·
794019 (1) ·
794036 (1) ·
794038 (1) ·
794045 (1) ·
795701 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.1 Mi North of Taylor Rd' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'15ft. N of Pine Island Dr' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)