Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Street ' (1) ·
'16TH ST ' (1) ·
'1st St SW ' (1) ·
'5th Street ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'CR-612 8th Street ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LittleRanchesTrail' (1) ·
'Madeline Avenue ' (1) ·
'MILITARY TR. SB ' (1) ·
'Old Boynton Road ' (1) ·
'Prosperity Farms R' (1) ·
'SR 400 WB ' (1)
790247 (1) ·
794188 (1) ·
884056 (1) ·
884066 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
884075 (1) ·
934178 (1) ·
934275 (1) ·
934276 (1) ·
934913 (1) ·
934934 (1) ·
934951 (1) ·
934981 (1) ·
935920 (1)
'0.4Mi. East of Congress A' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'0.6 Mi E of Williamson Bv' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'250ft North of SR-60 ' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'At 58th Ave ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'South Side of US-98 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)