Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'CR-515 & Indian River ' (1) ·
'HAULOVER CANAL ' (1) ·
'I-4 ' (1) ·
'Indian River ' (1) ·
'Lateral A Canal ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LAT 8 CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Turnbull Creek ' (1) ·
INDIAN RIVER (1)
'16th St/College Ln' (1) ·
'27TH STREET ' (1) ·
'COURTENAY PARKWAY ' (1) ·
'CR-4139 ' (1) ·
'KELLER ROAD ' (1) ·
'KUDZA ROAD ' (1) ·
'Pioneer Trail ' (1) ·
'Pioneer Trail ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
700015 (1) ·
700109 (1) ·
700110 (1) ·
700221 (1) ·
703001 (1) ·
703002 (1) ·
703004 (1) ·
790212 (1) ·
794117 (1) ·
794118 (1) ·
884084 (1) ·
885809 (1) ·
930430 (1) ·
930431 (1) ·
934312 (1) ·
936350 (1)
'0.15 mi East of Bay Drive' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.2MI S of FOREST HILL BV' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'CR-4139 over I-4 ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'SR-528 WB - Indian River ' (1) ·
KENNEDY SPACE CENTER (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)