Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700015 (1) ·
700096 (1) ·
700109 (1) ·
700110 (1) ·
700155 (1) ·
700221 (1) ·
700231 (1) ·
700232 (1) ·
700237 (1) ·
700238 (1) ·
795713 (1)
'200ft. S of 10th Street ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-95 SB - Sottile Canal ' (1) ·
'Over Fellsmere Canal ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'SR-528 WB - Indian River ' (1) ·
I-95 NB - Sottile Canal (1) ·
Over Fellsmere Canal (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)