Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Congress Ave. ' (1) ·
'INDIANTOWN RD. ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SR91 NB TPK 175.4 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 NB TPK 180.16' (1) ·
'SR91 NB TPK 189.1 ' (1) ·
'SR91 SB TPK 175.4 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91 SB TPK 180.16' (1) ·
'SR91 SB TPK 189.1 ' (1)
880057 (1) ·
880058 (1) ·
880059 (1) ·
880060 (1) ·
880065 (1) ·
880066 (1) ·
880067 (1) ·
880068 (1) ·
894019 (1) ·
930163 (1) ·
934142 (1) ·
934144 (1)
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'1.8 MI N OF ST LUCIE CNTY' (1) ·
'13 MI S OF SR 60 ' (1) ·
'13 MI SOUTH OF SR 60 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)