Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
704193 (1) ·
884038 (1) ·
884047 (1) ·
884073 (1) ·
884100 (1) ·
894049 (1) ·
895501 (1) ·
895504 (1) ·
895505 (1) ·
930800 (1) ·
944010 (1)
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At Pluckebaum Rd ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)