Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'16th Street ' (1) ·
'AUDUBON CSWY ' (1) ·
'AVENUE OF PGA ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CR-619 82ND AVE. ' (1) ·
'EB SR-710 ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'GRANDVIEW WAY ' (1) ·
'LARCH AVE ' (1) ·
'Levee Road ' (1) ·
'MINER RD. ' (1) ·
'MONET ROAD ' (1) ·
'Park Road ' (1) ·
'WB SR-710 ' (1)
884020 (1) ·
884081 (1) ·
930535 (1) ·
930536 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
930807 (1) ·
934254 (1) ·
934942 (1) ·
935207 (1) ·
936451 (1) ·
936551 (1) ·
937005 (1) ·
937007 (1) ·
937366 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.1 MI S of PGA BLVD ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'At 74th Avenue ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 16 results in range #1 to #16.