Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cabbage Slough ' (1) ·
'CANAL ' (1) ·
'FISHTAIL CANAL ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'Moore's Creek ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'St Johns River Relief ' (1) ·
'St. Johns River ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
Six Mile Creek (1)
'AUDUBON CSWY ' (1) ·
'AVENUE OF PGA ' (1) ·
'CENTRE PK. DR. N. ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'DATE PALM ROAD ' (1) ·
'GRANDVIEW WAY ' (1) ·
'LARCH AVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'North 9th Street ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-46 ' (1) ·
'WEST LAKE DRIVE ' (1) ·
SR-46 (1)
700030 (1) ·
700117 (1) ·
700194 (1) ·
790028 (1) ·
790029 (1) ·
790030 (1) ·
884020 (1) ·
935100 (1) ·
935203 (1) ·
936262 (1) ·
936263 (1) ·
936451 (1) ·
937005 (1) ·
937007 (1) ·
937366 (1) ·
937716 (1) ·
945014 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'.25 Mi E of AUSTRALIAN ' (1) ·
'0.1 MI S of PGA BLVD ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
'SR-46 - St. Johns Riv. R ' (1) ·
'SR-46 - St. Johns River ' (1) ·
SR-46 over Six Mile Cr (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.