Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. or
Other
Use the filters below to narrow your results.
790021 (1) ·
790027 (1) ·
790077 (1) ·
790078 (1) ·
790163 (1) ·
790185 (1) ·
790186 (1) ·
790201 (1) ·
790202 (1) ·
794016 (1) ·
794038 (1)
'0.4 mi S of Addison Drive' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 SB - Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)