Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Features 006a :
'Platt Ranch Access Road ' or
'RELIEF CANAL '
& Inspect Date 090:
04-17
Use the filters below to narrow your results.
'ALLAMANDA BLVD. ' (1) ·
'AVENUE OF PGA ' (1) ·
'BOBWHITE ROAD ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'GOLDFINCH LANE ' (1) ·
'GRANDVIEW WAY ' (1) ·
'HICKORY DRIVE ' (1) ·
'HOLLY DRIVE ' (1) ·
'LA MANCHA AVE. ' (1) ·
'LARCH AVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MADRID STREET ' (1) ·
'PONCE DE LEON ST ' (1) ·
'RAVEN COURT ' (1) ·
'ROYAL PALM BCH BLV' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'St. Johns Heritage' (1)
704190 (1) ·
884065 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1) ·
937005 (1) ·
937006 (1) ·
937007 (1) ·
937350 (1) ·
937351 (1) ·
937352 (1) ·
937353 (1) ·
937354 (1) ·
937355 (1) ·
937356 (1) ·
937357 (1) ·
937358 (1) ·
937359 (1) ·
937362 (1) ·
937366 (1)
'0.03MI W OF DOVE CIRCLE ' (1) ·
'0.1 MI S of PGA BLVD ' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.8MI N OF SR 80 ' (1) ·
'1.3MI N OF SR-80 ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2.9 Miles South of US-192' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)