Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Bch Blvd. ' (1) ·
'CRESTHAVEN BLVD ' (1) ·
'Gateway Blvd. ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'LE CHALET BLVD ' (1) ·
'PALMETTO PK RD ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'PURDY LANE ' (1) ·
'S. VERDE TRAIL ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'W. CAMINO REAL ' (1) ·
'WALLIS ROAD ' (1)
700087 (1) ·
700151 (1) ·
930438 (1) ·
934223 (1) ·
934322 (1) ·
934326 (1) ·
934345 (1) ·
934346 (1) ·
934363 (1) ·
934406 (1) ·
934487 (1) ·
934900 (1) ·
934901 (1) ·
934902 (1) ·
934903 (1) ·
934940 (1)
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.5MI W OF HAVERHILL ROAD' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'At S Military Trail ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)