Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Features 006a :
'LWDD E-1 Canal ' or
'Padgett Branch Marsh '
& Service Under 042b:
Other
Use the filters below to narrow your results.
'Boynton Beach Blvd' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'Lake Worth Road ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'PALOMINO DRIVE ' (1) ·
'PIONEER ROAD ' (1) ·
'SANDALFOOT BLVD EB' (1) ·
'SANDALFOOT BLVD WB' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SW THIRD ST ' (1)
880098 (1) ·
880099 (1) ·
930413 (1) ·
930464 (1) ·
934221 (1) ·
934328 (1) ·
934402 (1) ·
934404 (1) ·
934405 (1) ·
934428 (1) ·
934441 (1) ·
934904 (1) ·
934905 (1) ·
934927 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)