Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Features 006a :
'Intracoastal Waterway ' or
'POPPELTON CREEK '
& Inspect Date 090:
07-16
Use the filters below to narrow your results.
'Atlantic Avenue ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR714 PALM CITY RD' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E/B S.R. 704 ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'EB SR706 ' (1) ·
'LINTON BLVD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'Southern Boulevard' (1) ·
'SR A1A ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'US-1 (SR-5) ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Spanish River ' (1) ·
'WB SR 706 ' (1)
880053 (1) ·
890039 (1) ·
890107 (1) ·
930005 (1) ·
930064 (1) ·
930097 (1) ·
930154 (1) ·
930226 (1) ·
930269 (1) ·
930322 (1) ·
930453 (1) ·
930454 (1) ·
930506 (1) ·
930507 (1) ·
934160 (1) ·
934161 (1) ·
934908 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1/2MI S of US-1 ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)