Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Features 006a :
'INTRACOASTAL WATERWAY ' or
'Palm Beach Canal C-51 '
& Service Under 042b:
Waterway
Use the filters below to narrow your results.
None (1) ·
30975 (1) ·
74625 (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Delray Beach (1) ·
Fort Pierce (1) ·
Juno Beach (1) ·
Jupiter (1) ·
Lake Worth (1) ·
Lantana (1) ·
North Palm Beach village (1) ·
Palm Beach Gardens (1) ·
Riviera Beach (1) ·
Tequesta village (1) ·
Vero Beach (1) ·
West Palm Beach (1)
'Atlantic Avenue ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E. CAMINO REAL ' (1) ·
'E/B S.R. 704 ' (1) ·
'EB PGA Blvd. ' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'Highbridge Road ' (1) ·
'LINTON BLVD. ' (1) ·
'Southern Boulevard' (1) ·
'SR A1A ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-A1A ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'US-1 (SR-5) ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR 802 Lake Ave' (1) ·
'WOOLBRIGHT ROAD ' (1)
794025 (1) ·
880053 (1) ·
880077 (1) ·
890107 (1) ·
930004 (1) ·
930005 (1) ·
930026 (1) ·
930056 (1) ·
930064 (1) ·
930097 (1) ·
930104 (1) ·
930106 (1) ·
930214 (1) ·
930269 (1) ·
930322 (1) ·
930349 (1) ·
930367 (1) ·
930370 (1) ·
930506 (1) ·
930507 (1) ·
934160 (1) ·
934161 (1) ·
934369 (1) ·
934408 (1) ·
940045 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'0.25MI E OF US 1 ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'Lake Ave / ICWW ' (1)
26202200 (1) ·
26262317 (1) ·
26274181 (1) ·
26282666 (1) ·
26305220 (1) ·
26313736 (1) ·
26350300 (1) ·
26365544 (1) ·
26383900 (1) ·
26403161 (1) ·
26422200 (1) ·
26465867 (1) ·
26495569 (1) ·
26504000 (1) ·
26504098 (1) ·
26525465 (1) ·
26525529 (1) ·
26564568 (1) ·
26570930 (1) ·
27035280 (1) ·
27282176 (1) ·
27375640 (1) ·
27453510 (1) ·
29243110 (1)
80022882 (1) ·
80024000 (1) ·
80024400 (1) ·
80025300 (1) ·
80025351 (1) ·
80025423 (1) ·
80030866 (1) ·
80031431 (1) ·
80032041 (1) ·
80033671 (1) ·
80034367 (1) ·
80035127 (1) ·
80035475 (1) ·
80035722 (1) ·
80040100 (1) ·
80040991 (1) ·
80040992 (1) ·
80043770 (1) ·
80044370 (1) ·
80050482 (1) ·
80072029 (1) ·
80192117 (1) ·
80221680 (1) ·
80250470 (1) ·
81060320 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)