Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700133 (1) ·
700197 (1) ·
700198 (1) ·
700199 (1) ·
700225 (1) ·
704097 (1) ·
704098 (1) ·
790171 (1) ·
794189 (1) ·
890082 (1)
'0.25 Mi. West of SR-405 ' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Port St. John Pkwy - I-95' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)