Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cassadaga Road ' (1) ·
'CR-4139 ' (1) ·
'Enterprise Rd. ' (1) ·
'Graves Ave ' (1) ·
'I-4 EB Ramp A ' (1) ·
'Orange camp Rd. ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SR-472 EB ' (1) ·
'SR-472 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'Tomoka Farms Rd. ' (1)
700087 (1) ·
700151 (1) ·
790053 (1) ·
790105 (1) ·
790166 (1) ·
790167 (1) ·
790190 (1) ·
790191 (1) ·
790208 (1) ·
790210 (1) ·
790211 (1) ·
790212 (1) ·
790218 (1) ·
936500 (1)
'0.4 MILE N OF SR-710 ' (1) ·
'Cassadaga Road over I-4 ' (1) ·
'CR-4139 over I-4 ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'Graves Ave over I-4 ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Tomoka Farms Rd - I-4 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)