Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790099 (1) ·
790941 (1) ·
930197 (1) ·
930202 (1) ·
930210 (1) ·
930247 (1) ·
930276 (1) ·
930285 (1) ·
930304 (1) ·
930398 (1) ·
930434 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.25 mi. N of County Line' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1 mile West of US 1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'SR 808 / I 95 Interchange' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)