Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave. ' (1) ·
'Clint Moore Road ' (1) ·
'Congress Avenue ' (1) ·
'EB SR 704 ' (1) ·
'EB SR808 Glades Rd' (1) ·
'EB US 98 SR 80 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SW 18th Street ' (1) ·
'WB SR808 Glades Rd' (1) ·
'WB US 98 SR 80 ' (1)
790099 (1) ·
790941 (1) ·
930197 (1) ·
930202 (1) ·
930210 (1) ·
930247 (1) ·
930248 (1) ·
930276 (1) ·
930285 (1) ·
930462 (1) ·
930528 (1) ·
930529 (1) ·
930539 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.25 mi. N of County Line' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1 mile West of US 1 ' (1) ·
'Between SR704 and 12th St' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'North of P. Beach Airport' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)