Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
704194 (1) ·
880098 (1) ·
880099 (1) ·
930251 (1) ·
934464 (1) ·
934465 (1) ·
934960 (1) ·
935209 (1) ·
935210 (1) ·
935218 (1) ·
935221 (1) ·
935222 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.75 Mi. South of SR-520 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)