Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700097 (1) ·
930251 (1) ·
930367 (1) ·
934464 (1) ·
934465 (1) ·
934960 (1) ·
935209 (1) ·
935210 (1) ·
935218 (1) ·
935221 (1) ·
935222 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'.5mi East US1 Lakeworth ' (1) ·
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'2.2 Mi. S of Grant Rd. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)