Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790013 (1) ·
790021 (1) ·
790027 (1) ·
790077 (1) ·
790078 (1) ·
790163 (1) ·
790185 (1) ·
790186 (1) ·
790201 (1) ·
790202 (1) ·
794016 (1) ·
794038 (1)
'0.4 mi S of Addison Drive' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 over 11th Canal ' (1) ·
'US-1 SB - Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)