Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10th Ave. North ' (1) ·
'Australian Ave. ' (1) ·
'Central Blvd ' (1) ·
'Clint Moore Road ' (1) ·
'Congress Avenue ' (1) ·
'E Gateway Blvd ' (1) ·
'EB SR 704 ' (1) ·
'EB SR808 Glades Rd' (1) ·
'EB US 98 SR 80 ' (1) ·
'Hood Road ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SW 18th Street ' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'US-1 ' (1) ·
'WB SR808 Glades Rd' (1) ·
'WB US 98 SR 80 ' (1) ·
'Woolbright Road ' (1)
790013 (1) ·
930197 (1) ·
930202 (1) ·
930210 (1) ·
930247 (1) ·
930248 (1) ·
930260 (1) ·
930276 (1) ·
930285 (1) ·
930301 (1) ·
930304 (1) ·
930379 (1) ·
930398 (1) ·
930434 (1) ·
930462 (1) ·
930528 (1) ·
930529 (1) ·
930539 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.25 mi. N of County Line' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1 mile North of SR 786 ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'10th Ave over I 95 ' (1) ·
'Between SR704 and 12th St' (1) ·
'I 95 Exit 56 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'North of P. Beach Airport' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'US-1 over 11th Canal ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)