Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700108 (1) ·
700109 (1) ·
700111 (1) ·
700140 (1) ·
700151 (1) ·
700153 (1) ·
700198 (1) ·
880100 (1) ·
880101 (1) ·
880102 (1) ·
880105 (1) ·
930478 (1)
'0.6 MILE WEST OF US-1 ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'I-95 over SR-60 ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 EB over SR-3 ' (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)