Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'SR 60 ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'Summit Boulevard ' (1)
880100 (1) ·
880101 (1) ·
880102 (1) ·
880105 (1) ·
930261 (1) ·
930291 (1) ·
930489 (1) ·
930498 (1) ·
930503 (1) ·
930530 (1) ·
940152 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1 mile North of SR 704 ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 over SR-60 ' (1) ·
'I-95 SR 806 interchange ' (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
176174 (1) ·
181308 (1) ·
184778 (1) ·
198658 (1) ·
199525 (1) ·
201260 (1) ·
27066 (1) ·
75472 (1) ·
75473 (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)