Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'CAMINO CANAL ' (1) ·
'CANAL E-1 ' (1) ·
'CANAL E-4 ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'GARDEN CANAL ' (1) ·
'IWW Halifax River ' (1) ·
'LAKE OSBOURNE ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'SR-524 ' (1)
'ARMONE PLACE ' (1) ·
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CONGRESS AVE SB ' (1) ·
'EB Forest Hill Bld' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'LANTANA ROAD EB ' (1) ·
'MILITARY TR. SB ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR A1A ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-528 WB ' (1) ·
'SR-A1A ' (1)
700089 (1) ·
790174 (1) ·
790175 (1) ·
930268 (1) ·
934342 (1) ·
934349 (1) ·
934489 (1) ·
934905 (1) ·
934931 (1) ·
934932 (1) ·
934934 (1) ·
935206 (1) ·
935207 (1) ·
935307 (1) ·
940003 (1) ·
940085 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'AT SR-7 US-441 ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)