Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'C-18 CANAL ' (1) ·
'Deep Creek ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Ashby Canal ' (1) ·
'Loxahatchee Slough ' (1) ·
'Miller Creek ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'St Johns River Relief ' (1) ·
'St. Johns River ' (1) ·
'St. Johns River Relief ' (1) ·
'Sweetwater Creek ' (1) ·
'Trib to Spruce Creek ' (1) ·
'Tributary to Spruce Crk ' (1)
790033 (1) ·
790034 (1) ·
790035 (1) ·
790124 (1) ·
790198 (1) ·
790219 (1) ·
790220 (1) ·
794007 (1) ·
794008 (1) ·
794019 (1) ·
794045 (1) ·
930106 (1) ·
930265 (1) ·
930349 (1) ·
930356 (1) ·
930388 (1) ·
930491 (1) ·
930492 (1) ·
930557 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.1 Mi North of Taylor Rd' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1st overpass east of I-95' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-415 - St. Johns River ' (1) ·
'SR-415 -St. Johns Relief ' (1) ·
'SR-415- St.Johns River ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)