Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAKE OSBOURNE ' (1) ·
'Lantana Road ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'ORANGE CANAL ' (1) ·
'Rowland Canal ' (1) ·
'ROY'S SWALE ' (1) ·
'St. Lucie Canal/SR-76 ' (1)
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR-726 CITRUS BLVD' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'Hypoluxo Rd ' (1) ·
'Hypoluxo to SB I95' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Lantana to I 95 SB' (1) ·
'SB I 95 to Lantana' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SILVER FOX LANE ' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'West Farms Road ' (1)
890015 (1) ·
890161 (1) ·
890162 (1) ·
894029 (1) ·
894042 (1) ·
894056 (1) ·
930274 (1) ·
930275 (1) ·
930276 (1) ·
930298 (1) ·
930299 (1) ·
930307 (1) ·
931002 (1) ·
931003 (1) ·
934331 (1) ·
934332 (1) ·
934341 (1) ·
934342 (1) ·
934369 (1)
'0.3 Mile East of US-1 ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)