Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'C-18 Canal ' (1) ·
'CANAL C-24 ' (1) ·
'Canal C-54 ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Indian River Relief ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'Military Trail & CSX RR ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'US-1 ' (1)
'Babcock Street ' (1) ·
'COUNTY LINE RD ' (1) ·
'EB SR808 Glades Rd' (1) ·
'Fay Blvd. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Island Way ' (1) ·
'JOG ROAD ' (1) ·
'OLD DIXIE HWY ' (1) ·
'Port St. Lucie Bld' (1) ·
'PROSPERITY FARMS R' (1) ·
'SAVONA BLVD. ' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-407 ' (1) ·
'SR-76 ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'US 192 WB ' (1) ·
'US-192 EB ' (1) ·
'WB SR808 Glades Rd' (1)
700091 (1) ·
700233 (1) ·
700234 (1) ·
704154 (1) ·
704161 (1) ·
790082 (1) ·
790083 (1) ·
790166 (1) ·
790167 (1) ·
880100 (1) ·
890079 (1) ·
890127 (1) ·
894021 (1) ·
930241 (1) ·
930245 (1) ·
930246 (1) ·
934116 (1) ·
934177 (1) ·
934273 (1) ·
934911 (1) ·
940142 (1) ·
945256 (1)
'.05 mi N of Indian Rvr Co' (1) ·
'.25 mi East of I-95 ' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'800 ft West of I 95 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'Fay Blvd. - I-95 ' (1) ·
'I-95 NB over US-1 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-192 EB - Indian Riv ' (1)
26220525 (1) ·
26220610 (1) ·
26252148 (1) ·
26404140 (1) ·
26485165 (1) ·
26561000 (1) ·
26571548 (1) ·
26581931 (1) ·
26590684 (1) ·
27064891 (1) ·
27161021 (1) ·
27162224 (1) ·
27363540 (1) ·
27492427 (1) ·
28051366 (1) ·
28051434 (1) ·
28275318 (1) ·
28300578 (1) ·
28543983 (1) ·
28544052 (1) ·
29200900 (1) ·
29200964 (1)
80042484 (1) ·
80043488 (1) ·
80065384 (1) ·
80071550 (1) ·
80071555 (1) ·
80082400 (1) ·
80084271 (1) ·
80095581 (1) ·
80104223 (1) ·
80152053 (1) ·
80213032 (1) ·
80231068 (1) ·
80304170 (1) ·
80345659 (1) ·
80345692 (1) ·
80362615 (1) ·
80491666 (1) ·
80501889 (1) ·
81075150 (1) ·
81075240 (1) ·
81161842 (1) ·
81161879 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)