Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Features 006a :
'PARK LATERAL CANAL ' or
'WEST PALM BEACH CANAL '
& Direction 102:
Other
Use the filters below to narrow your results.
884003 (1) ·
884063 (1) ·
884064 (1) ·
884068 (1) ·
930409 (1) ·
930410 (1) ·
934259 (1) ·
937704 (1) ·
937708 (1) ·
937715 (1) ·
937716 (1)
'.25 Mi E of AUSTRALIAN ' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'AT 141st ST ' (1) ·
'SR-7 & SR-80 intersection' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)