Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Direction 102: One lane bridge for 2 way traffic & Scour 113: Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures

Use the filters below to narrow your results.

ObjectID:
Status:
Date:
County 003:
Place 004:
Route 005d:
Direction 005e:
Features 006a:
Critical 006b:
Number 008:
Latitude 016:
Longitude 017:
Owner 022:
Built 027:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Culvert 062:
Inspect Date 090:
Direction 102: (Click arrow to add another value)
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 2 results in range #1 to #2.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)