Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'BELCHER CANAL C-25 ' (1) ·
'C-24 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CANAL-1 ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'Hillsboro Canal ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'JOANN CANAL ' (1) ·
'L-5 Canal ' (1) ·
'LAKE IDA CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL G CANAL ' (1) ·
'Little Haw Creek ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'RANGE LINE CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Seaboard Coastline RR ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SUBDIVISION CANAL ' (1) ·
'TAYLOR CREEK CANAL-1 ' (1) ·
'TEN MILE CREEK ' (1) ·
'TIDAL CANAL ' (1) ·
'Turkey Creek ' (1)
'4TH STREET ' (1) ·
'53RD STREET ' (1) ·
'74TH AVE. ' (1) ·
'90TH AVE ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'CARLTON RD (CR613)' (1) ·
'CARTER RD. ' (1) ·
'CORAL DRIVE ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR-632 (65TH ST.) ' (1) ·
'CR-880 ' (1) ·
'CR603(JOHNSTON RD)' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'CR712A (MCCARTY RD' (1) ·
'Entrnce Rd to FDOT' (1) ·
'French Avenue ' (1) ·
'GLADES CUTOFF ' (1) ·
'HURON WAY ' (1) ·
'JOG ROAD ' (1) ·
'KEEN RD (CR-611) ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'Levee Road ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'Old Daytona Rd ' (1) ·
'Old Samsula Dr ' (1) ·
'Private Road ' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SHINN ROAD ' (1) ·
'SIMARA STREET ' (1) ·
'SW 22ND WAY ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'VENICE DRIVE ' (1)
Number 008:
Location 009:
Latitude 016:
Longitude 017:
10 (1) ·
100 (1) ·
1000 (1) ·
101 (1) ·
1047 (1) ·
1086 (1) ·
1100 (1) ·
120 (1) ·
1350 (1) ·
138 (1) ·
14400 (1) ·
15000 (1) ·
1650 (1) ·
186 (1) ·
200 (1) ·
2000 (1) ·
211 (1) ·
2300 (1) ·
260 (1) ·
280 (1) ·
300 (1) ·
3100 (1) ·
34244 (1) ·
3600 (1) ·
364 (1) ·
36794 (1) ·
4 (1) ·
40 (1) ·
400 (1) ·
4000 (1) ·
4483 (1) ·
4500 (1) ·
500 (1) ·
5500 (1) ·
6 (1) ·
600 (1) ·
6124 (1) ·
7400 (1) ·
950 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Future 114:
Showing below up to 47 results in range #1 to #47.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch