Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'BOYNTON CANAL ' (1) ·
'C.S.X. R/R ' (1) ·
'CANAL-17 ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'Indian River East Relief' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'Moore's Creek ' (1) ·
'North Relief Canal ' (1) ·
'South Relief Canal ' (1) ·
'SR-91 N/S TPK ' (1) ·
'US-1 & FECRR ' (1)
'56th Place North ' (1) ·
'Australian Ave. ' (1) ·
'CLINT MOORE RD ' (1) ·
'Emerson Ave 27th A' (1) ·
'Forest Hill Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'Old Dixie Highway ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'Spanish River Blvd' (1) ·
'SR-44 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR91 On/Off Rmp106' (1) ·
'US-1 (SR-5) ' (1) ·
'Woolbright Road ' (1)
790128 (1) ·
790149 (1) ·
880088 (1) ·
884082 (1) ·
890146 (1) ·
930004 (1) ·
930300 (1) ·
930359 (1) ·
930529 (1) ·
931011 (1) ·
934329 (1) ·
934362 (1) ·
934365 (1) ·
934366 (1) ·
934908 (1) ·
934929 (1) ·
934953 (1) ·
934954 (1) ·
935222 (1) ·
935223 (1) ·
940151 (1)
'.75mi E. of Indian R Dr. ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 mile North of SR-70 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'56th Place North ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'AT US-441 SR-7 ' (1) ·
'North of P. Beach Airport' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'W of I 95 on Woolbright ' (1)
26210242 (1) ·
26231070 (1) ·
26231230 (1) ·
26243117 (1) ·
26305200 (1) ·
26321971 (1) ·
26333297 (1) ·
26341358 (1) ·
26352535 (1) ·
26352546 (1) ·
26390702 (1) ·
26415780 (1) ·
26481194 (1) ·
26490300 (1) ·
26495569 (1) ·
27151700 (1) ·
27265830 (1) ·
27355287 (1) ·
27413623 (1) ·
29011550 (1) ·
29014148 (1)
80033671 (1) ·
80041660 (1) ·
80042680 (1) ·
80043210 (1) ·
80045519 (1) ·
80054717 (1) ·
80065730 (1) ·
80074322 (1) ·
80075297 (1) ·
80102240 (1) ·
80102572 (1) ·
80111927 (1) ·
80112020 (1) ·
80121251 (1) ·
80121946 (1) ·
80124800 (1) ·
80193646 (1) ·
80245043 (1) ·
80260616 (1) ·
80551845 (1) ·
80553031 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.