Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'DRAINAGE CANAL ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'E-4 Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'HOWARD CREEK ' (1) ·
'I-4 ' (1) ·
'Indian River / ICW ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LATERAL U CANAL ' (1) ·
'Little Lake Worth ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'SR 60 ' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'Tide Relief Canal ' (1) ·
'W. Relief Indian River ' (1)
'CR-512 ' (1) ·
'CR-880 ' (1) ·
'Graves Ave ' (1) ·
'Indiantown Rd. ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LE CHALET BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'Old Boynton Road ' (1) ·
'Orange camp Rd. ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR A1A ' (1) ·
'SR-44 ' (1) ·
'SR-732 -Jensen Bch' (1) ·
'SR-808 Glades Road' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'WESTMORELAND BLVD ' (1)
790172 (1) ·
790211 (1) ·
790218 (1) ·
880102 (1) ·
884067 (1) ·
884068 (1) ·
890138 (1) ·
890145 (1) ·
930015 (1) ·
930325 (1) ·
930351 (1) ·
930361 (1) ·
930391 (1) ·
930412 (1) ·
930447 (1) ·
930546 (1) ·
931012 (1) ·
934487 (1) ·
934924 (1) ·
934956 (1) ·
934981 (1) ·
945250 (1)
'.5 mi East of I-95 ' (1) ·
'.5mi E. of Indian R Dr. ' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'A1A on Singer Island ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'Graves Ave over I-4 ' (1) ·
'I-95 over SR-60 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
26205893 (1) ·
26220527 (1) ·
26221756 (1) ·
26233940 (1) ·
26252613 (1) ·
26315430 (1) ·
26331032 (1) ·
26401030 (1) ·
26404182 (1) ·
26490902 (1) ·
26503760 (1) ·
26560311 (1) ·
26562145 (1) ·
27150311 (1) ·
27151000 (1) ·
27153115 (1) ·
27382038 (1) ·
27442320 (1) ·
27454113 (1) ·
28565524 (1) ·
28590460 (1) ·
29021928 (1)
80022456 (1) ·
80032660 (1) ·
80050300 (1) ·
80055515 (1) ·
80074659 (1) ·
80075125 (1) ·
80083165 (1) ·
80092080 (1) ·
80101504 (1) ·
80102169 (1) ·
80111481 (1) ·
80121038 (1) ·
80131300 (1) ·
80133779 (1) ·
80172570 (1) ·
80270492 (1) ·
80310299 (1) ·
80365199 (1) ·
80383118 (1) ·
80542264 (1) ·
81145411 (1) ·
81153534 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)