Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51/WEST PALM BCH CANAL' (1) ·
'DRAINAGE CANAL ' (1) ·
'E-4 Canal ' (1) ·
'Eau Gallie River ' (1) ·
'Halifax River ' (1) ·
'HOWARD CREEK ' (1) ·
'I-4 ' (1) ·
'Indian River / ICW ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL U CANAL ' (1) ·
'Little Lake Worth ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'Tide Relief Canal ' (1) ·
'W. Relief Indian River ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB CANAL C-51 ' (1)
'Apollo Boulevard ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CR-512 ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'CR-880 ' (1) ·
'Graves Ave ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'KIRK ROAD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'Old Boynton Road ' (1) ·
'Orange Avenue ' (1) ·
'Orange camp Rd. ' (1) ·
'SR A1A ' (1) ·
'SR-44 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-732 -Jensen Bch' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-A1A ' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'SW 15TH AVE ' (1) ·
'WESTMORELAND BLVD ' (1)
705604 (1) ·
790172 (1) ·
790211 (1) ·
790218 (1) ·
794120 (1) ·
880077 (1) ·
884056 (1) ·
884067 (1) ·
884068 (1) ·
890138 (1) ·
890145 (1) ·
930351 (1) ·
930361 (1) ·
930373 (1) ·
930546 (1) ·
931012 (1) ·
934293 (1) ·
934461 (1) ·
934487 (1) ·
934751 (1) ·
934956 (1) ·
934981 (1) ·
937715 (1) ·
945250 (1)
'.5mi E. of Indian R Dr. ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'250ft North of SR-60 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'A1A on Singer Island ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Graves Ave over I-4 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-44 - Indian River ' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
26252613 (1) ·
26305150 (1) ·
26315430 (1) ·
26331032 (1) ·
26383999 (1) ·
26403700 (1) ·
26404182 (1) ·
26405713 (1) ·
26413718 (1) ·
26490902 (1) ·
26503760 (1) ·
26562145 (1) ·
27150311 (1) ·
27151000 (1) ·
27153115 (1) ·
27375640 (1) ·
27382201 (1) ·
27442320 (1) ·
27454113 (1) ·
28073710 (1) ·
28565524 (1) ·
28590460 (1) ·
29021928 (1) ·
29123122 (1)
80022456 (1) ·
80032221 (1) ·
80032660 (1) ·
80041853 (1) ·
80044272 (1) ·
80050300 (1) ·
80061380 (1) ·
80075125 (1) ·
80092080 (1) ·
80111481 (1) ·
80131300 (1) ·
80133779 (1) ·
80172570 (1) ·
80172828 (1) ·
80221680 (1) ·
80254872 (1) ·
80270492 (1) ·
80365199 (1) ·
80383118 (1) ·
80384610 (1) ·
80542264 (1) ·
81010006 (1) ·
81145411 (1) ·
81153534 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.