Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'CR 702 45th Street ' (1) ·
'CSX Railroad ' (1) ·
'E-3 CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'ICWW ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Northlake Blvd. ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'WARNER CREEK ' (1) ·
'WPB Drainage Canal ' (1)
'20TH AVENUE ' (1) ·
'Bellevue Avenue ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'Dunn Avenue ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'SR AIA ' (1) ·
'SR-406 ' (1) ·
'SR-407 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'St. Johns Heritage' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'SW 23RD AVE. ' (1)
700091 (1) ·
700227 (1) ·
704190 (1) ·
790241 (1) ·
794189 (1) ·
884062 (1) ·
890113 (1) ·
930294 (1) ·
930302 (1) ·
930303 (1) ·
930304 (1) ·
930370 (1) ·
930458 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
934948 (1) ·
940094 (1)
'0.25 MI. W OF I-95 ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'Between SR 710 and 786 ' (1) ·
'I-95 / SR 882 ' (1) ·
'Just West of I 95 ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'South Causeway over ICWW ' (1) ·
'SR-406 over Indian River ' (1)
11300 (1) ·
13000 (1) ·
13700 (1) ·
15100 (1) ·
160500 (1) ·
19200 (1) ·
200 (1) ·
213000 (1) ·
226000 (1) ·
232000 (1) ·
3400 (1) ·
4000 (1) ·
6100 (1) ·
6400 (1) ·
7300 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
10584 (1) ·
11104 (1) ·
12665 (1) ·
19606 (1) ·
22555 (1) ·
23770 (1) ·
26199 (1) ·
278468 (1) ·
369555 (1) ·
392110 (1) ·
402520 (1) ·
420 (1) ·
5899 (1) ·
6940 (1) ·
73250 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)