Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'BELCHER CANAL C-25 ' (1) ·
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'Blue Lake Equalizer ' (1) ·
'BRANCH OF ICWW ' (1) ·
'BRITT CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'C-18 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'CANAL-1 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'Cow Creek ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'FISHTAIL CANAL ' (1) ·
'Halifax River ' (1) ·
'Halifax River IWW ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Indian River ' (1) ·
'L.W.D.D. #10 ' (1) ·
'LATERAL G CANAL ' (1) ·
'Little Haw Creek ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Canal ' (1) ·
'Middle Haw Creek ' (1) ·
'MOORES CREEK ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'Reed Canal ' (1) ·
'SFWMD L-13 CANAL ' (1) ·
'St Johns River Relief ' (1) ·
'St. Johns River ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'TEN MILE CREEK ' (1)
'53RD STREET ' (1) ·
'BRITT RD ' (1) ·
'CONGRESS AVE ' (1) ·
'CR 76A ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-632 (65TH ST.) ' (1) ·
'CR-700 ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'DATE PALM RD ' (1) ·
'DATE PALM ROAD ' (1) ·
'DAVIS ROAD ' (1) ·
'E. Minnesota Ave. ' (1) ·
'ELEVEN MILE ROAD ' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'JUPITER BEACH RD ' (1) ·
'Magnolia Avenue ' (1) ·
'Maytown Road ' (1) ·
'RANGE LINERD CR609' (1) ·
'S. LAKE DRIVE ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR-40 ' (1) ·
'SR-46 ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR-60 Osceola Blvd' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR-A1A ' (1) ·
'SR510 Wabasso Road' (1) ·
'STAR ISLAND WAY ' (1) ·
'SW 23RD AVE. ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1)
Number 008:
Location 009:
Latitude 016:
Longitude 017:
100 (1) ·
121 (1) ·
13000 (1) ·
13300 (1) ·
1350 (1) ·
1500 (1) ·
1650 (1) ·
18000 (1) ·
2000 (1) ·
21500 (1) ·
2300 (1) ·
2401 (1) ·
2850 (1) ·
28500 (1) ·
300 (1) ·
31000 (1) ·
3160 (1) ·
3300 (1) ·
33000 (1) ·
34500 (1) ·
364 (1) ·
3900 (1) ·
416 (1) ·
4500 (1) ·
46500 (1) ·
4800 (1) ·
52000 (1) ·
5500 (1) ·
5900 (1) ·
6700 (1) ·
6900 (1) ·
7800 (1) ·
960 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
10236 (1) ·
11624 (1) ·
11972 (1) ·
13533 (1) ·
1665 (1) ·
174 (1) ·
180 (1) ·
18000 (1) ·
2020 (1) ·
22555 (1) ·
23076 (1) ·
2342 (1) ·
240 (1) ·
2500 (1) ·
2603 (1) ·
2863 (1) ·
2905 (1) ·
31230 (1) ·
3500 (1) ·
37303 (1) ·
3800 (1) ·
3991 (1) ·
440 (1) ·
49448 (1) ·
500 (1) ·
53785 (1) ·
57255 (1) ·
5726 (1) ·
59858 (1) ·
6766 (1) ·
694 (1) ·
700 (1) ·
7140 (1) ·
80678 (1) ·
8328 (1) ·
90220 (1) ·
9543 (1)
Showing below up to 41 results in range #1 to #41.
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch