Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal ' (1) ·
'B-19 Canal / Trib 1 ' (1) ·
'B19 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'Canal ' (1) ·
'Carter's Canal ' (1) ·
'Halifax Canal Lateral ' (1) ·
'Halifax River ' (1) ·
'I-95 ' (1) ·
'IWW Halifax River ' (1) ·
'Rose Bay Canal ' (1) ·
'Sebastian Canal ' (1) ·
'SR-514 ' (1) ·
'Sweetwater Branch ' (1) ·
'Sweetwater Creek ' (1) ·
'Turkey Creek ' (1)
'Babcock Street ' (1) ·
'Briar Creek Blvd. ' (1) ·
'Esplanade Avenue ' (1) ·
'Hurley Blvd ' (1) ·
'I-95 ' (1) ·
'Jackson Street ' (1) ·
'Madeline Avenue ' (1) ·
'Main Street ' (1) ·
'Malabar Rd ' (1) ·
'S Williamson Blvd ' (1) ·
'SR-421 ' (1) ·
'SR-5A ' (1) ·
'SR-A1A ' (1) ·
'Taylor Rd ' (1) ·
'Trailwood Drive ' (1) ·
'Willow Run Blvd. ' (1)
700162 (1) ·
700202 (1) ·
704004 (1) ·
704042 (1) ·
705500 (1) ·
705919 (1) ·
790136 (1) ·
790147 (1) ·
790148 (1) ·
790173 (1) ·
794010 (1) ·
794095 (1) ·
794122 (1) ·
794188 (1) ·
796401 (1) ·
796412 (1) ·
796413 (1) ·
796414 (1)
'.2mi W of Clyde Morris Bl' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.6 Mi E of Williamson Bv' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.75 mi. E. of I-95 ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.5 Mi. S of SR-514 ' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'400ft N of SCLRR on SR-5A' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'Canal View Blvd Intrsectn' (1) ·
'I-95 - SR-514 ' (1) ·
'S. Williamson BI-I-95 ' (1) ·
'SR-A1A over Halifax River' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)